Pilot Control Environment
Production Grade Evaluation

Pilot Program

A production-grade installation with measured outcomes, acceptance tests, and a clean handover.

Designed for commissioned environments

Residences and penthouses with complex lighting, climate, and access

Estates requiring role-safe operation across staff and operators

Yachts requiring telemetry integration and disciplined boundaries

Facilities where stability and auditability matter

What a pilot includes

01

Interface

Role-safe UI surfaces for owner, staff, and engineering

02

Control Core

Hardened on-prem deployment inside the client network

03

Policy + Audit

Single actuation boundary with correlation IDs

04

Commissioning

Offline, degraded-mode, and recovery acceptance tests

05

Handover

Runbook excerpt, topology summary, config export bundle

Typical Timeline

Discovery

Week 1–2

Interface inventory + scope boundaries + protocol mapping

Commissioning Build

Week 3–5

Certified hardware + validated release line

On-site Deployment

Week 6–8

Installation + acceptance testing

Handover

Week 8–10

Reports, runbooks, change history, and stewardship plan

Requirements to start

  • Protocol inventory and access to existing gateways
  • A commissioning window for acceptance tests
  • Agreement on scope boundaries

Commercial Structure

Pilots are scoped by environment complexity and interface count. We provide a fixed-band estimate after discovery.

Fixed-Band Estimate

Request a pilot scope

If you want a stable, local-first system that ages well, start with a commissioned pilot.